Austal Limited (Austal) is pleased to announce the U.S. Navy has accepted delivery of USNS Carson City (EPF-7) from Austal USA, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 24 June.

This is the second vessel delivered by Austal USA to the U.S. Navy this month.
Austal Chief Executive Officer (CEO) David Singleton said the delivery of the latest Expeditionary Fast Transport (EPF) is further evidence of Austal USA’s success in efficient, modern shipbuilding and expertise in modular manufacturing.
«Our hard working, highly skilled workforce continues to deliver on this important program, which is redefining naval capability and exceeding stakeholder expectations around the globe».
Three additional EPF remain under construction in Mobile as part of a 10-ship, US$1.6 billion block-buy contract from the U.S. Navy. The future USNS Yuma (EPF-8) will be christened later this summer and will launch soon after, while modules for the City of Bismarck (EPF-9) are under construction in Austal’s Module Manufacturing Facility (MMF). The first aluminium was cut for Burlington (EPF-10) earlier this month and module construction has begun in the MMF.
SPECIFICATIONS
PRINCIPAL DIMENSIONS | |
Material | Hull and superstructure – aluminium alloy |
Length overall | 103 m/337.9 feet |
Beam overall | 28.5 m/93.5 feet |
Hull draft (maximum) | 3.83 m/12.57 feet |
MISSION BAY | |
Area (with tie-downs) | 1,863 m2/20,053 feet2 |
Clear Height | 4.75 m/15.6 feet |
Turning diameter | 26.2 m/86.0 feet |
ISO TEU (Twenty Equivalent Units) Stations | 6 Interface Panels |
ACCOMMODATIONS | |
Crew | 41 |
Single SR | 2 |
Double SR | 6 |
Quad SR | 7 |
Troop Seats | 312 |
Troop Berths | Permanent: 104 |
Temporary: 46 | |
Galley and Messing | 48 |
PROPULSION | |
Main Engines | 4 × MTU 20V8000 M71L Diesel Engines 4 × 9.1 MW |
Gear boxes | 4 × ZF 60000NR2H Reduction Gears |
Waterjets | 4 × Wartsila WLD 1400 SR |
PERFORMANCE | |
Average Speed | 35 knots/40 mph/65 km/h @ 90% MCR with 635 mt (700 st) payload |
Maximum Speed | 43 knots/50 mph/80 km/h without payload |
Maximum Transit Range | 1,200 NM/1,381 miles/2,222 km |
Self-Deployment Range | 5,600 NM/6,444 miles/10,371 km |
Survival Through | SS-7 |
AVIATION FACILITIES | |
NAVAIR Level 1 Class 2 Certified Flight Deck for one helicopter | |
Centreline parking area for one helicopter | |
NAVAIR Level 1 class 4 Type 2 Certified VERTREP (Vertical Replenishment) | |
Helicopter Control Station | |
AUXILIARY SYSTEMS | |
Active Ride Control | Transcom Interceptors |
Foils: 3.24 m2/34.9 feet2 each, forward on inboard sides of demi-hulls | |
Vehicle Ramp | Articulated Slewing Stern Ramp |
Straight aft to 45 Starboard | |
Telescoping Boom Crane | 12.3 mt @ 15 m, 18.2 mt @ 10 m/13.6 Lt @ 49.2 feet, 20.1 Lt @ 32.8 feet |

Ships
USNS Spearhead (EPF-1), Delivered
USNS Choctaw County (EPF-2), Delivered
USNS Millinocket (EPF-3), Delivered
USNS Fall River (EPF-4), Delivered
USNS Trenton (EPF-5), Delivered
USNS Brunswick (EPF-6), Delivered
USNS Carson City (EPF-7), Delivered
Yuma (EPF-8), under construction
Bismark (EPF-9), under construction
Burlington (EPF-10), under construction
EPF-11
EPF-12