John Warner Delivered

Huntington Ingalls Industries’ (HII) Newport News Shipbuilding division delivered the nuclear-powered fast attack submarine USS John Warner (SSN-785) to the U.S. Navy on Jun 25, 2015. The Virginia-class submarine, the first to be named for a person, was delivered two and a half months ahead of schedule.

The submarine USS John Warner (SSN-785) delivered on June 25, 2015, two and a half months ahead of schedule (Photo by Chris Oxley/HII)
The submarine USS John Warner (SSN-785) delivered on June 25, 2015, two and a half months ahead of schedule (Photo by Chris Oxley/HII)

«This submarine embodies the spirit of Senator Warner and symbolizes his unwavering support for the Navy and the shipyard», said Jim Hughes, Newport News’ vice president of submarines and fleet support. «It’s truly special to have a boat named after a living person, and we as shipbuilders are proud to deliver John Warner to the Navy because this submarine will continue Senator Warner’s enduring legacy».

John Warner is the 12th Virginia-class submarine and the sixth to be delivered by Newport News. Nearly 4,000 shipbuilders have worked on the submarine since construction began in 2010. The nuclear-powered fast attack submarine was named for John Warner, who served as Secretary of the Navy and represented Virginia in the Senate for 30 years. USS John Warner (SSN-785) was christened by Senator Warner’s wife, Jeanne Warner, on September 6, 2014. Commissioning is scheduled on August 1.

«Today, we are excited to join the operational fleet and to bring Senator Warner’s legacy back to the Navy, carrying on his tradition of service to our nation», said Commander Dan Caldwell, the submarine’s commanding officer. «The crew and the ship have performed exceptionally well during the acceptance trials, and we are prepared and excited to conduct the operational missions which await us».

Newport News is teamed with General Dynamics Electric Boat to build Virginia-class submarines, which use advanced technologies to increase firepower, maneuverability and stealth. The 377-foot-long/114.8-meter-long submarines are capable of submerged speeds of more than 25 knots/28 mph/46.3 km/h and can stay submerged for up to three months at a time.

She will be the first in the class to be named after a person
She will be the first in the class to be named after a person

 

General Characteristics

Builder Huntington Ingalls Industries Inc. – Newport News Shipbuilding
Date Deployed Jun 25, 2015
Propulsion One S9G* nuclear reactor, one shaft
Length 377 feet/114.8 m
Beam 33 feet/10.0584 m
Hull Diameter 34 feet/10.5156 m
Displacement Approximately 7,800 tons/7,925 metric tons submerged
Speed 25+ knots/28+ mph/46.3+ km/h
Diving Depth 800+ feet/244+ m
Crew 132: 15 officers; 117 enlisted
Armament: Tomahawk missiles two 87-inch/2.2-meter Virginia Payload Tubes (VPTs), each capable of launching 6 Tomahawk cruise missiles
Armament: MK-48 ADCAP (Advanced Capability) Mod 7 heavyweight torpedoes 4 torpedo tubes
Weapons MK-60 CAPTOR (Encapsulated Torpedo) mines, advanced mobile mines and UUVs (Unmanned Underwater Vehicles)

* – Knolls Atomic Power Laboratories

The Virginia-class submarine USS John Warner (SSN-785) completed alpha sea trials on Saturday. All systems, components and compartments were tested. The submarine also submerged for the first time and operated at high speeds on the surface and underwater (Photo by Chris Oxley/HII)
The Virginia-class submarine USS John Warner (SSN-785) completed alpha sea trials on Saturday. All systems, components and compartments were tested. The submarine also submerged for the first time and operated at high speeds on the surface and underwater (Photo by Chris Oxley/HII)

 

Nuclear Submarine Lineup

Ship Yard Christening Commissioned Homeport
SSN-774 Virginia EB 8-16-03 10-23-04 Portsmouth, New Hampshire
SSN-775 Texas NNS 7-31-05 9-9-06 Pearl Harbor, Hawaii
SSN-776 Hawaii EB 6-19-06 5-5-07 Pearl Harbor, Hawaii
SSN-777 North Carolina NNS 4-21-07 5-3-08 Pearl Harbor, Hawaii
SSN-778 New Hampshire EB 6-21-08 10-25-08 Groton, Connecticut
SSN-779 New Mexico NNS 12-13-08 11-21-09 Groton, Connecticut
SSN-780 Missouri EB 12-5-09 7-31-10 Groton, Connecticut
SSN-781 California NNS 11-6-10 10-29-11 Groton, Connecticut
SSN-782 Mississippi EB 12-3-11 6-2-12 Groton, Connecticut
SSN-783 Minnesota NNS 10-27-12 9-7-13 Norfolk, Virginia
SSN-784 North Dakota EB 11-2-13 10-25-14 Groton, Connecticut
SSN-785 John Warner NNS 09-06-14

EB – Electric Boat, Groton, Connecticut

NNS – Newport News Shipbuilding, Newport News, Virginia