Damen’s new OPV

On 20 April 2015, Damen Shipyards Group gave a sneak preview of their newly designed 2nd generation Offshore Patrol Vessels (OPVs) during the annual OPVs & Corvettes Asia Pacific conference in Singapore. Damen’s Design & Proposal Manager Piet van Rooij explained how this new OPV has been configured for various missions.

The development of the «Axe Bow Concept» followed, a hull shape with unparalleled seakeeping characteristics: the maximum acceleration ever measured on the bow of an existing Axe-Bow is 1.3 G. Based on this concept, Damen has developed the «Sea Axe» Patrol Boats and Fast Crew Suppliers. Damen has delivered over 150 Axe-Bows since 2006
The development of the «Axe Bow Concept» followed, a hull shape with unparalleled seakeeping characteristics: the maximum acceleration ever measured on the bow of an existing Axe-Bow is 1.3 G. Based on this concept, Damen has developed the «Sea Axe» Patrol Boats and Fast Crew Suppliers. Damen has delivered over 150 Axe-Bows since 2006

This new generation of re-configurable Damen OPVs is highly efficient and incredibly versatile. Damen’s famous Sea Axe hull shape is used for these 2nd generation OPVs. Due to this hull design, these vessels demonstrate superior seakeeping including exceptional low heave accelerations. This makes the vessel very comfortable, even in stormy sea states.

Since the hull is designed to reduce water resistance, the new OPV is also very fuel efficient and capable of speeds up to 25/26 knots/29/30 mph/46/48 km/h.

Versatility has been reinvented by three newly developed multi-mission locations – namely the Bridge, Hangar and Bay. The Multi-Mission Bay (MM Bay) can be equipped with dedicated mission modules (e.g. mission containers) for missions such as counter piracy, counter-drug operations, Anti-Mining Warfare (AMW), Search-And-Rescue (SAR) etc.

The MM Bay is also equipped with a nine-meter Rigid-Hulled Inflatable Boat (RHIB), which can be launched over a dedicated slipway through the rear of the vessel while the OPV is sailing. In the Damen-built Holland Class Ocean Patrol vessels for the Royal Netherlands Navy this system has already proven to be safe in operations up to SS 5 conditions.

Mission modules (dedicated containers) can be lifted into the Multi-Mission Bay, through the helicopter deck
Mission modules (dedicated containers) can be lifted into the Multi-Mission Bay, through the helicopter deck

Unlike other OPVs, the Command-and-Control Centre (C2 Centre) is located directly behind the bridge. Damen calls this development their Multi-Mission Bridge (MM Bridge). Both spaces can be separated by means of a blinded sliding wall. OPVs are less likely to take part in combat situations such as those faced by a frigate.

During a mission, when lowering the sliding wall, situation awareness in the C2 Centre is improved, allowing C2 Centre officers to observe the situation immediately with their own eyes.

Mr. Van Rooij comments: «Today OPVs don’t engage in combat situations as often as frigates do, however, fast and effective coordination during a ‘chase’ is essential for an OPV».

The Multi-Mission Hangar (MM Hangar) is capable of storing an 11-tonne NH-90 helicopter and an Unmanned Aerial Vehicle (UAV) such as the Boeing ScanEagle. The MM Hangar has been designed so that the OPV crew can deploy either the helicopter or the UAV without having to move either one. Furthermore, there is space for a spare parts store and workshop for both the helicopter and UAV.

The Damen OPV 2nd generation is available as a standard in four series:

  • 75 meter/246 feet – 1,400 tonnes;
  • 85 meter/279 feet – 1,800 tonnes;
  • 95 meter/312 feet – 2,400 tonnes;
  • 103 meter/338 feet – 2,600 tonnes.
Depending on the mission and the situation, the C&C Centre can be separated from the Bridge by means of a blinded sliding door
Depending on the mission and the situation, the C&C Centre can be separated from the Bridge by means of a blinded sliding door

 

MAIN CHARACTERISTICS

Series OPV 1400 OPV 1800 OPV 2400 OPV 2600
Displacement 1,400 tonnes 1,800 tonnes 2,400 tonnes 2,600 tonnes
Length o.a. 75 m/246 feet 85 m/279 feet 95 m/312 feet 103 m/338 feet
Beam moulded 12.7 m/ 41.7 feet 13.7 m/45 feet 14.4 m/47 feet 14.4 m/47 feet
Draft 3.8 m/12.5 feet 4 m/13 feet 4 m/13 feet 4 m/13 feet
Speed maximum (MSR) 23 knots/ 26 mph/42 km/h 25 knots/ 29 mph/46 km/h 26 knots/ 30 mph/48 km/h 26 knots/ 30 mph/48 km/h
Range 4,000 NM/ 7,408 km 5,000 NM/ 9,260 km 6,000 NM/ 11,112 km 7,000 NM/ 12,964 km
Endurance 25 days 30 days 40 days 40 days
Helicopter & UAV hangar telescopic telescopic telescopic telescopic
Helicopter flight deck & refueling standard standard standard standard
Helicopter hangar area, L×B 19.2×6 m/ 63×19.7 feet 19.2×6 m/ 63×19.7 feet 19.2×6 m/ 63×19.7 feet 19.2×6 m/ 63×19.7 feet
Helicopter flight deck area, L×B 25×12.7 m/ 82×41.7 feet 25×13.7 m/ 82×45 feet 25×14.4 m/ 82×47 feet 25×14.4 m/ 82×47 feet
Take-off weight maximum 6 tonnes 11 tonnes 11 tonnes 11 tonnes
Multi-Mission Bridge standard standard standard standard
Multi-Mission Bay standard standard standard standard
Mission Module Containers 2 3 3 5
Number of RHIBs 2 2 2
Length of RHIBs 9 m 9 m 9 m 9 m
Core Complement capacity 40 60 60 60
Additional in Multi-role compartment 12 36 48 48
Multi-role compartment area 130 m2/ 1,399.3 feet2 190 m2/ 2,045.1 feet2 220 m2/ 2,368 feet2 320 m2/ 3,444.4 feet2
A small slipway makes ultrafast RHIB deployment possible, while sailing
A small slipway makes ultrafast RHIB deployment possible, while sailing