Tag Archives: General Purpose (GP)

Tenth Italian FREMM

The First Steel Cutting ceremony for the twelfth FREMM (the tenth Italian frigate) took place on 12 October at Fincantieri integrated shipyard in Riva Trigoso (Genoa).

FREMM (F599)
First Steel Cutting ceremony for the twelfth FREMM

On the one hand, the event officially represents the beginning of production phase for a new ship, on the other, as the tenth frigate complete the batch for the Italian Navy, the conclusion of a path started in the 2008 with the first steel cutting of ITS Bergamini (F590).

Today, at the ceremony were present the FREMM Programme Manager – Mr. Luigi Durante, the Naval Armament Directorate (NAVARM) Representative – Captain Gianni Labori and the Industrial representatives.

The delivery of the twelfth FREMM is planned in late 2025, only six months after the eleventh Frigate.

The last two Italian units will be realized in the General Purpose (GP) version, with an updated release of several systems giving the Italian Navy the opportunity to have frigates at the state of the art in order to fulfil a wide range of missions.

 

Technical Information

Overall Length 144 m/472.4 feet
Width 20 m/65.6 feet
Displacement 6700 tonnes
Maximum Speed 27 knots/31 mph/50 km/h
Crew 145 people
Accommodation Up to 200 men and women
Range 6,000 NM/6,905 miles/11,112 km