Austal Limited is pleased to announce that Austal USA has been awarded a US$235 million (approximately A$295 million) undefinitised contract by the United States Navy (USN) for the detailed design and construction of the 15th Expeditionary Fast Transport (EPF) vessel.

Austal USA has delivered twelve EPFs to the U.S. Navy since 2012, on schedule and under budget, from the company’s Mobile, Alabama, shipyard.
Austal Limited Chief Executive Officer Paddy Gregg said the new contract was a clear demonstration of confidence by the US Navy in the versatile EPF platform, designed by Austal Australia and manufactured by Austal USA. «The EPF has become a real success story, delivering a fast, flexible and versatile capability to the US Navy. The EPF has made a real difference to military operations and other humanitarian and disaster relief missions over many years now, and this additional vessel contract reflects the continuing confidence in the unique high-speed platform», Mr. Gregg said.
«This latest EPF will expand the medical facilities available on-board, further enhancing the proven operational capabilities of the ship, which has been used for various medical missions in the Pacific, South East Asia and Western Africa. Austal USA is understandably proud of its record of success with the EPF, which has been deployed and operated by U.S. Military Sealift Command (USMSC) for the US Navy, in theatres around the world».
The Spearhead-class EPF is a 103-meter/338-foot high-speed aluminium catamaran with a large, 1,863 m2/20,053 feet2 cargo deck, medium-lift helicopter deck and seating for 300+ embarked troops; providing a fast, high-payload transport capability to combatant commanders around the world. The Austal-designed and built EPFs support a wide range of missions – from maritime security operations to humanitarian aid and disaster relief.
An EPF’s flexibility also allows it to support potential future missions; such as special operations, command and control, and primary medical operations.
One Spearhead-class EPF, the future USNS Apalachicola (EPF-13), is currently under construction at Austal USA’s shipyard, while the future USNS Cody (EPF-14) is scheduled to commence construction in the second half of FY2021. In addition to the EPF program, Austal USA is contracted to deliver 19 Independence-class Littoral Combat Ships (LCS) for the U.S. Navy.
Thirteen Independence-class LCS’ have been delivered, with an additional five ships in various stages of construction and one contracted but yet to commence construction.
This ASX announcement has been approved and authorised for release by Paddy Gregg, Austal Limited’s Chief Executive Officer.
SPECIFICATIONS
PRINCIPAL DIMENSIONS | |
Material | Hull and superstructure – aluminium alloy |
Length overall | 103 m/337.9 feet |
Beam overall | 28.5 m/93.5 feet |
Hull draft (maximum) | 3.83 m/12.57 feet |
MISSION BAY | |
Area (with tie-downs) | 1,863 m2/20,053 feet2 |
Clear Height | 4.75 m/15.6 feet |
Turning diameter | 26.2 m/86.0 feet |
ISO TEU (Twenty Equivalent Units) Stations | 6 Interface Panels |
ACCOMMODATIONS | |
Crew | 41 |
Single SR | 2 |
Double SR | 6 |
Quad SR | 7 |
Troop Seats | 312 |
Troop Berths | Permanent: 104 |
Temporary: 46 | |
Galley and Messing | 48 |
PROPULSION | |
Main Engines | 4 × MTU 20V8000 M71L Diesel Engines 4 × 9.1 MW |
Gear boxes | 4 × ZF 60000NR2H Reduction Gears |
Waterjets | 4 × Wartsila WLD 1400 SR |
PERFORMANCE | |
Average Speed | 35 knots/40 mph/65 km/h @ 90% MCR with 635 mt (700 st) payload |
Maximum Speed | 43 knots/50 mph/80 km/h without payload |
Maximum Transit Range | 1,200 NM/1,381 miles/2,222 km |
Self-Deployment Range | 5,600 NM/6,444 miles/10,371 km |
Survival Through | SS-7 |
AVIATION FACILITIES | |
NAVAIR Level 1 Class 2 Certified Flight Deck for one helicopter | |
Centreline parking area for one helicopter | |
NAVAIR Level 1 class 4 Type 2 Certified VERTREP (Vertical Replenishment) | |
Helicopter Control Station | |
AUXILIARY SYSTEMS | |
Active Ride Control | Transcom Interceptors |
Foils: 3.24 m2/34.9 feet2 each, forward on inboard sides of demi-hulls | |
Vehicle Ramp | Articulated Slewing Stern Ramp |
Straight aft to 45 Starboard | |
Telescoping Boom Crane | 12.3 mt @ 15 m, 18.2 mt @ 10 m/13.6 Lt @ 49.2 feet, 20.1 Lt @ 32.8 feet |
Ships
USNS Spearhead (EPF-1), Delivered
USNS Choctaw County (EPF-2), Delivered
USNS Millinocket (EPF-3), Delivered
USNS Fall River (EPF-4), Delivered
USNS Trenton (EPF-5), Delivered
USNS Brunswick (EPF-6), Delivered
USNS Carson City (EPF-7), Delivered
USNS Yuma (EPF-8), Delivered
USNS City of Bismark (EPF-9), Delivered
USNS Burlington (EPF-10), Delivered
USNS Puerto Rico (EPF-11), Delivered
USNS Newport (EPF-12), Delivered
USNS Apalachicola (EPF-13), Under construction
USNS Cody (EPF-14), Under construction
EPF-15, Planned