In an historic milestone for the DDG 51 program, the keel of the first Flight III destroyer, the future USS Jack H. Lucas (DDG-125), was ceremoniously laid and authenticated at Huntington Ingalls Shipyard, November 7.

Ruby Lucas and Catherine B. Reynolds, ship sponsors, authenticated the keel by etching their initials into the keel plate. Although the official start of fabrication began in May 2018, authenticating the ship’s keel symbolically recognizes the joining of modular components and represents the ceremonial beginning of the ship.
«This destroyer was named after an American hero, Medal of Honor recipient Jack Lucas, and I am humbled and honored to be here today as we authenticate the keel on his namesake ship», said Capt. Seth Miller, DDG 51 class program manager, Program Executive Office (PEO) Ships. «The Flight III ships will bring increased lethality and warfighting capacity to our warfighters, and today’s milestone is the first of many to come as we work to deliver this highly capable ship to the Fleet», he added.
USS Jack H. Lucas (DDG-125) will be the first Arleigh Burke class destroyer built in the Flight III configuration with improved capability and capacity to perform Anti-Air Warfare and Ballistic Missile Defense in support of the Integrated Air and Missile Defense mission.
The Flight III design contains modifications from the earlier DDG-51 class, to enable the SPY-6 radar, in association with Aegis Baseline 10, which includes larger electronically scanned arrays and the power generation and cooling equipment required to operate the powerful new radar.
These multi-mission surface combatants serve as integral assets in global maritime security, engaging in air, undersea, surface, strike and ballistic missile defense, as well as providing increased capabilities in anti-submarine warfare, command and control, and anti-surface warfare.
HII’s Pascagoula shipyard is also currently in production on the guided missile destroyers USS Delbert D. Black (DDG-119), USS Frank E. Petersen Jr. (DDG-121), and USS Lenah H. Sutcliffe Higbee (DDG-123), amphibious assault ships USS Tripoli (LHA-7) and USS Bougainville (LHA-8), and amphibious transport dock ships USS Fort Lauderdale (LPD-28) and USS Richard M. McCool Jr. (LPD-29).
As one of the Defense Department’s largest acquisition organizations, PEO Ships is responsible for executing the development and procurement of all destroyers, amphibious ships, special mission and support ships, boats and craft.
Guided Missile Destroyers Lineup
Flight III
Ship | Yard | Launched | Commissioned | Homeport |
DDG-125 Jack H. Lucas | HIIIS | |||
DDG-126 Louis H. Wilson, Jr. | GDBIW | |||
DDG-128 Ted Stevens | HIIIS | |||
DDG-129 Jeremiah Denton | HIIIS | |||
DDG-130 William Charette | GDBIW | |||
DDG-131 George M. Neal | HIIIS | |||
DDG-132 Quentin Walsh | GDBIW | |||
DDG-133 Sam Nunn | HIIIS | |||
DDG-134 John E. Kilmer | GDBIW | |||
DDG-135 | ||||
DDG-136 | ||||
DDG-137 | ||||
DDG-138 |