Decision on MKS 180

The Schleswig-Holstein shipyard GERMAN NAVAL YARDS KIEL (GNYK) submitted the final offer for the construction of the multi-purpose warship MKS 180 on 18 July. Together with its cooperation partner ThyssenKrupp Marine Systems, the company is competing for the largest naval contract in the history of Bundeswehr. GNYK is the only remaining German general contractor in the European competition of the German Ministry of Defense.

The MKS 180 frigate is a larger and more capable warship than those currently operated by the German Navy; it is designed for long-duration foreign deployments, with an endurance more than tripled compared to the current F125 frigates (TKMS image)

Jörg Herwig, Managing Director of GERMAN NAVAL YARDS KIEL, said: «By submitting our offer, we have done everything in our power to obtain this contract for Germany. Should we win the contract, not only we as a shipyard, but hundreds of small and medium-sized companies throughout Germany will benefit from the project. It is decisive that we as German shipyard receive orders from our own government. This is the only way we can become less dependent on exports».

The construction of MKS 180 could provide a major impetus for German naval shipbuilding. «This is vital for the innovative strength of the entire industry. Furthermore, thousands of jobs could be preserved permanently. With the construction of MKS 180, we as German shipbuilding companies have the opportunity to maintain our technological leadership in international competition», said Herwig.

GERMAN NAVAL YARDS KIEL will develop, design and build MKS 180 in Germany. The initial plan is to build four ships. The decision on the allocation is now incumbent on the Federal Ministry of Defence. A decision is expected at the end of 2019.

GNYK has a first-class infrastructure and the necessary experience to build technologically highly complex naval vessels. The shipyard is also able to repair simultaneously several large ships. An operating shipyard infrastructure on the Baltic Sea is of particular importance in terms of security policy for NATO operations or military exercises.

 

Characteristics

Length approximately 508.5 feet/155 meters at waterline
Displacement maximum 9,000 tonnes
Accommodation 110-person crew, 70 passengers
Operating endurance 24 months
Operating area worldwide
Ice class 1C/E1 for sea areas with ice formation
Service life 30 years

 

Leave a Reply